Wikimedia Technology/Annual Plans/FY2019/TEC1: Reliability, Performance, and Maintenance/Goals

Program Goals and Status for FY18/19 edit

  • Goal Owners: Mark Bergsma; Kate Chapman; Nuria Ruiz; Bryan Davis
  • Program Goals for FY18/19: We will maintain the availability of Wikimedia’s sites and services for our global audiences and ensure they’re running reliably, securely, and with high performance. We will do this while modernizing our infrastructure and improving current levels of service when it comes to testing, deployments, and maintenance of software and hardware.
  • Annual Plan: TEC1: Reliability, Performance, and Maintenance

edit

Outcome / Output (Analytics) edit

We have scalable, reliable and secure systems for data transport and data processing.

Analytics stack maintains current level of service. OS Upgrades. task T192642

Goal(s) edit

  • Continue upgrading to Debian Stretch:
    • AQS   Done
    • thorium   Done
    • Archiva   Done
    • bhorium (where piwik resides)   To do
  • Refresh of:
    • hadoop master nodes   Done
    • analytics1003   In progress

Status edit

  Note: July 2018

one goal   In progress

  Note: August 22, 2018

one goal   Partially done

  Note: September 18, 2018

Remaining hosts to be completed before end of quarter   Partially done

Outcome 1 / Output 1.1 (SRE) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Dependencies on: Core Platform (MediaWiki, RESTbase), Performance, Release Engineering, Parsing (Parsoid), Analytics (EventBus),Community Liaisons; Primary team: SRE

Goal(s) edit

Perform a datacenter switchover

  • Successfully switch backend traffic (MediaWiki, Swift, RESTBase, and Parsoid) to be served from codfw with no downtime and reduced read-only time   Done
  • Serve the site from codfw for at least 3 weeks   In progress
  • Refactor the switchdc script into a more re-usable automation library and update it to the newer switchover requirements   Done

Status edit

  Note: July 2018

Discussed...

  Note: August 14, 2018

  In progress this is ongoing and looking good, had some minor delays but it's scheduled for Sep for first switchover and back in October.

  Note: September 11, 2018

  In progress The switch to codfw is happening this week. The switchdc refactoring is complete and has been published as a generically re-usable (FOSS) automation library, as and is published as spicerack (FOSS).


Outcome 1 / Output 1.1 (SRE / Traffic) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Primary teams: SRE & Traffic

Goal(s) edit

  • Deploy an ATS backend cache test cluster in core DCs:   Done
    • 2x 4 node clusters
    • Puppetization
    • Application-layer routing
  • Deploy a scalable service for ACME (LetsEncrypt) certificate management:   In progress
    • Features:
      • Core DC redundancy
      • Wildcards + SANs
      • Multiple client hosts for each cert
    • Coding + Puppetization
    • Deploy in both DCs
    • Live use for one prod cert
  • Increase network capacity:   Partially done
    • eqiad: 2 rows with 3*10G racks
    • codfw: 2 rows with 3*10G racks
    • ulsfo: replace routers
    • eqdfw: replace router

Status edit

  Note: July 2018

Discussed...

  Note: August 14, 2018

  Partially done The ATS testing and creation of packages is going well and some is already in production. This is doing the basic needs so far but nearly done.
  In progress ACME service is also on track
  In progress Increasing network capacity goal is moving much slower than expected, due to hardware installation (network switches) on the switch stacks issues with the vendor. This goal is at risk for this quarter due to these hardware and testing issues with the new/old switches. The replacement routers will also be at risk for this quarter.

  Partially done September 2018

  •   Done This goal is fully complete; an ATS test cluster has been setup in both core DCs.
  •   In progressACME software has been written, deployment and use is expected by end of the quarter.
  •   In progressIncreasing network capacity goal has hit a roadblock, due to network switch stack topology incompatibility issues with the vendor, causing network instability in production. This goal is at risk for this quarter, as we can neither take any risks nor move swifty on this very essential and critical infrastructure. The replacement of the routers is expected to complete before EOQ.


Outcome 1 / Output 1.1 (Performance) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Primary team: Performance

Goal(s) edit

  • Improve synthetic monitoring   In progress
    • Monitor more WMF sites, including some in each deploy group
    • Configure alerts such that they're directed to the teams that are able to address them
  • Improve Navigation Timing data   In progress
    • Update dashboards to use newer navtiming2 keys
    • Move navtiming data from graphite to prometheus
  • Remove dependency on jQuery from Mediawiki's base Javascript module   Done
  • Support and develop the Mediawiki ResourceLoader component   In progress
    • Dependency: Core Platform
  • Support and develop Mediawiki's data access components   In progress
    • Dependency: Core Platform

Status edit

  Note: July 2018

  In progress

  Note: August 14, 2018

  In progress Synthentic monitoring and timing data is in progress but slightly delayed due to summer vacations. Everything else is in progress or done.

  Note: September 18, 2018

  In progress Synthetic monitoring and timing data are in progress and on track. Other goals are ongoing maintenance work that don't have a defined end state.


Outcome 2 / Output 2.1 (Performance) edit

Better designed systems

Assist in the architectural design of new services and making them operate at scale

Primary team: Performance

Goal(s) edit

  • Research performance perception in order to identify specific metrics that influence user behavior

Status edit

  Note: July 2018

Discussed...

  Note: August 14, 2018

  In progress

  Note: September 18, 2018

  In progress Data collection is in progress and continues to go well. Data analysis will continue in to Q2


Outcome 3 / Output 3.1 (WMCS) edit

Users can leverage a reliable and public Infrastructure as a Service (IaaS) product ecosystem for VPS hosting.

Maintain existing OpenStack infrastructure and services

Primary team: WMCS

Goal(s) edit

  • Develop timeline for Ubuntu Trusty deprecation   Done
  • Communicate deprecation timeline to Cloud VPS community   To do
  • Continue replacing Trusty with Debian Jessie/Stretch in infrastructure layer   In progress

Status edit

  Note: July 2018

  In progress

  Note: August 10, 2018

  In progress Discussed: that experiments have been completed but showed some issues   Done, will need to build parallel grids, new puppet code, etc   In progress

  Note: September 12, 2018

  In progress Brooke has made some progress on Puppet changes that will allow us to build a second grid engine deployment with Debian Stretch. This outcome will carry over into Q2 and progress should accelerate as the parallel Neutron migration project moves from development to implementation.


Outcome 3 / Output 3.2 (WMCS) edit

Users can leverage a reliable and public Infrastructure as a Service (IaaS) product ecosystem for VPS hosting.

Replace the current network topology layer with OpenStack Neutron

Primary team: WMCS

Goal(s) edit

  • Migrate at least one Cloud VPS project to the eqiad1 region and its Neutron SDN layer   Done

Status edit

  Note: July 2018

  In progress

  Note: August 10, 2018

  In progress discussed working on getting eqiad to play well with MAIN (shared services)

  Note: September 12, 2018

  In progress * Arturo found a way to transparently route traffic between the legacy Nova Network deployment and the new Neutron deployment. This should make migrating projects to the new deployment significantly easier and more transparent for our end users.
  In progress * Also, Progress is currently stalled due to unexpected hardware compatibility issues with Debian Jessie on new cloudvirt servers. We are getting a lot of help from the DC Ops team and Moritz to find solutions for these issues, but until we have a working combination of hardware & software we are holding off on procuring new servers. This in turn will slow the rate at which we can move projects to the new deployment. This is of larger impact for our Q2 continuation of this program than it is to meeting the current Q1 goal of moving at least one project.

edit

Outcome / Output (Analytics) edit

We have scalable, reliable and secure systems for data transport and data processing.

Analytics stack maintains current level of service.
Completing the OS upgrade to Debian stretch. Prepare the replacement of the Analytics store database.

Goal(s) edit

  • Continue upgrading to Debian Stretch:
    • bhorium (where piwik resides)   Done
  • Order hardware and set up basic puppet configuration for the dbstore1002's replacement (multi-instance database hosts).   Partially done
  • STRETCH GOAL: Set up Mysql data replication on the dbstore1002's replacement.
  • STRETCH GOAL: Add prometheus metrics for varnishkafka instances running on caching hosts task T196066

Status edit

  Note: October 19, 2018

Update to stretch goal is   Done for piwik machine; hardware orders for dbstore are in place

  Note: November 14, 2018

Prometheus work is now   In progress

  To do December 2018

Discussed...

Outcome 1 / Output 1.1 (SRE) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Primary team(s): SRE, Dependencies on: Cloud Services, Search, Core Platform

Goal(s) edit

  • Refresh hardware and perform necessary maintenance

Status edit

  Note: October 2018

This is now   In progress as hardware is being ordered

  Note: November 14, 2018

This is still   In progress, as hardware has been ordered and is being received and installed. The codfw Parser Cache hosts is   Partially done and the etcd migration is   Done

  Note: December 12, 2018

Leased hardware will be sent back by next week, and the refresh will be   Done in the next two weeks.


Outcome 1 / Output 1.1 (SRE/Traffic) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Primary team(s): SRE/Traffic

Goal(s) edit

  • ATS production-ready as a backend cache layer   Partially done
    • Purging   Done
    • Logging   Done
    • Monitoring   Done
    • Alerting   Done
    • Multi-DC Routing   Done
    • Backend-side request-mangling   Done
    • All the above prepares us for potential ATS live deployment as cache_upload backends in FQ3
    • Audit all Varnish-fronted services for lack of TLS, ping owners ahead of needs in FQ3/4 and beyond   Partially done
  • Migrate most standard public TLS certificates to CertCentral issuance   Done
    • Replaces previous minimal/legacy LetsEncrypt automation
    • Work out bugs / operational issues that arise as we scale up CertCentral usage
    • Explicitly out of scope public certs: the big unified wildcard, frack, labs
  • Increase Network Capacity   Partially done
    • Follow-up and Follow-on to same goal from FQ1
    • eqiad: Finish new switches and migration to supported topologies - phab:T187962 - phab:T183585
    • codfw: Finish new switches and migration to supported topologies - phab:T197147
    • Replace cr1-eqord in Chicago
    • Add cr2-eqsin in Singapore

Status edit

  To do October 2018

Discussed...

  Note: November 14, 2018

This goal is   Partially done as purging for the ATS goal has been implemented and the cr1-eqord Chicago router replacement has completed.
We have a possible  N Stalled issue as the Network Capacity goal is at risk for FQ2 due to the holidays and critical infrastructure freezes.

  Note: December 12, 2018

ATS goal will be   Done shortly and the certificate work will be also   Done in the next week. Increasing network capacity will be   Done in Q3, as fundraising is still on-going; the cabling will be done as soon as they are received   Partially done

  Note: December 13, 2018

The certificates goal is   Done


Outcome 1 / Output 1.1 (RelEng) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Dependencies on: SRE

Goal(s) edit

  • Determine the procedure and requirements for an automated MediaWiki branch cut.

Status edit

  Note: October 2, 2018

This work is still   To do

  Note: November 7, 2018

Scoping work at https://phabricator.wikimedia.org/T156445

  Note: December 6, 2018

This   In progress goal will be nearly complete by finishing up https://phabricator.wikimedia.org/T208528 and https://phabricator.wikimedia.org/T208529 in the next week or so.


Outcome 1 / Output 1.1 (Performance) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Dependencies on: SRE

Goal(s) edit

  • Train feature developers on the use of performance metrics to detect and address regressions.
    • Create and deliver a training session on the use of synthetic metrics   Partially done
    • Create and deliver a training session on the use of RUM metrics   Partially done
  • Deliver high-traffic images as WebP   Done
  • Improve Navigation Timing data, by moving it from Graphite to Prometheus  N Not done
  • Expand mobile testing
    • Run extended/ongoing tests of performance on mobile phones   Done
  • Expand outreach and engagement with the wider Performance community
    • Attend W3C meeting, as a participant in the Web Performance Working Group   Done
    • Begin publishing a monthly blog post summarizing performance over the prior month  N Not done
    • Figure out whether it is possible to publish Navigation Timing data sets in some appropriately anonymized form  N Not done
  • Test the effect of Mediawiki commits on Performance
    • Add a basic performance test as part of the Jenkins pipeline, as a non-voting member   Done
  • Ongoing maintenance of components owned by Performance team or individuals   Done
    • MediaWiki's data access components
    • ResourceLoader
    • WebPageTest and other synthetic testing infrastructure
    • Thumbor/thumbnail generation

Status edit

  Note: October 18, 2018

Discussed how things are on track right now for progress for the quarter.

  Note: November 14, 2018

Improve Navigation Timing data, by moving it from Graphite to Prometheus is now   In progress
Attendance at the last W3C meeting is   Done

  Note: December 12, 2018

Anonymized data publishing deferred to Q3  N Stalled
WebP thumbnails is   Done
Improve Navigation Timing data, by moving it from Graphite to Prometheus   Partially done
Proposal for W3C is   In progress
Summary blog post will be sent out soon   Partially done
Ongoing maintenance of components owned by Performance team or individuals is (always)   In progress

Outcome 2 / Output 2.1 (Performance) edit

Better designed systems

Assist in the architectural design of new services and making them operate at scale

Primary team: Performance

Goal(s) edit

  • Research performance perception in order to identify specific metrics that influence user behavior   Done (continues in Q3)

Status edit

  Note: October 18, 2018

Discussed how this goal is still   In progress (was a carry-over from Q1)

  Note: December 12, 2018

  In progress Final milestone is presentation of the research paper internally on December 17th; will hear about acceptance in early 2019 and is mostly   Done at this point while we wait; Gilles is working with the Research team on this goal and will have follow-on work in 2019.

Outcome 3 / Output 3.1 (WMCS) edit

Users can leverage a reliable and public Infrastructure as a Service (IaaS) product ecosystem for VPS hosting.

Maintain existing OpenStack infrastructure and services

Primary team: WMCS

Goal(s) edit

  • Continue replacing Trusty with Debian Jessie/Stretch in infrastructure layer   In progress
  • Communicate Trusty deprecation timeline to Cloud VPS community   Done
  • Develop Trusty deprecation plan for Toolforge and communicate timeline to community   In progress
  • Track progress towards full removal of Trusty from Cloud VPS to encourage migration   In progress

Status edit

  Note: November 14, 2018

Updated per goal status and added links.

  Note: December 12, 2018

These goals are still   In progress, and we're still a bit stalled on the full plan communication to the community until it's actually done, so that the community can immediately go in and use it — we hope to be fully done by end of Q3.


Outcome 3 / Output 3.2 (WMCS) edit

Users can leverage a reliable and public Infrastructure as a Service (IaaS) product ecosystem for VPS hosting.

Replace the current network topology layer with OpenStack Neutron

Primary team: WMCS

Goal(s) edit

  • Migrate 50% of Cloud VPS projects to the eqiad1 region and its Neutron SDN layer   Done

Status edit

  Note: November 14, 2018

This goal is now   In progress, as of this week, we had 72 out of 170 (~42%) migrated.

  Note: December 12, 2018

We have surpassed this goal and are at ~65% of all projects have been migrated. This effort will continue in Q3, but this goal is considered   Done for this quarter.

edit

Outcome 1 / Output 1.1 (RelEng) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Dependencies on: SRE

Goal(s) edit

  • Automate the generation of change log notes
  • Investigate notification methods for developers with changes that are riding any given train

Status edit

  Note: March 13, 2019

Both goals are   Done


Outcome 1 / Output 1.1 (SRE / Traffic) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Primary teams: SRE & Traffic

Goal(s) edit

  • Deploy managed LetsEncrypt certs for all public use-cases:
  • Increase network capacity:
  • Test and deploy equal prioritization of peering and transit
    • Establish metrics to monitor: performance impact and transit bandwidth
    • Trial the change and gather new metrics
    • Compare and decide whether (and/or where) to keep the new priorities based on perf and cost analysis
    • https://phabricator.wikimedia.org/T204281
  • Implement Ping Offload service in core DCs

Status edit

  Note: January 10, 2019

  • Discussed that as we've just gotten back from our vacations, this work is ramping up and is   In progress

  Note: February 19, 2019

  • Most of these are still   In progress: certcentral renaming is nearing completion, cr2-eqsin is on-track to deploy, peering priority change has been done for esams, ping offload still looking at final design issues

  Note: March 27, 2019

  • certcentral renaming is   Partially done and will finish up in Q4
  • network capacity configuring and deploying is   Done
  • prioritization of peering and transit is   Done
  • Ping Offload service in core DCs is   Partially done and expected to be fully completed by end of March or first week of April.

  Note: April 8, 2019

  • All unfinished bits were finished up last week!   Done

Outcome 1 / Output 1.1 (Performance) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Dependencies on: SRE

Goals edit

  • Post quarterly metrics (carried over)
  • Develop a strategy for oversampling NavTiming data from unrepresented countries, in order to better understand performance characteristics in less connected/lower bandwidth geographies   In progress
  • Expand use of WebP thumbnails where it makes sense to do so, and actively clean up Swift.   In progress
  • Prepare and deliver presentations on both synthetic and RUM metrics, with a specific focus on how to make the data that comes from those metrics actionable.   In progress
  • Publish an initial ISP ranking, working with Comms to promote as appropriate   In progress
  • Expand performance testing on mobile devices   In progress
  • [Ongoing] Support and maintenance of MediaWiki's ResourceLoader and associated components
  • [Ongoing] Support and maintenance of MediaWiki's object caching and data access components
  • [Ongoing] Support and maintenance of Thumbor/thumbnail infrastructure
  • [Ongoing] Support and maintenance of WebPageTest and synthetic testing infrastructure

Status edit

  Note: January 9, 2019

  • discussed and updated above.

  Note: February 13, 2019

  • Discussed that everything is still in progress, we're working with Legal and Commons on the ISP ranking

  Note: March 13, 2019

  • Discussed that everything is still   In progress; ISP ranking service is   Partially done but waiting word from Legal before publishing.


Outcome 2 / Output 2.1 (Performance) edit

Better designed systems

Assist in the architectural design of new services and making them operate at scale

Primary team: Performance

Goal(s) edit

  • Research performance perception in order to identify specific metrics that influence user behavior   In progress
  • Testing/operational support for new session store   In progress
  • Testing/operational support for ATS migration   To do

Status edit

  Note: January 9, 2019

  • Most of this is in progress, but is reliant on other teams.

  Note: February 13, 2019

  • Discussed that the session store work is now   In progress

  Note: March 13, 2019

  • We are still in a support role for this, but still   In progress


Outcome / Output (Analytics) edit

We have scalable, reliable and secure systems for data transport.

Analytics stack maintains current level of service.
Dependancies on SRE teams

Goal(s) edit

  • Replace dbstore1002 before April.  Move people away from dbstore1002 to the new set of hosts, and deprecate it before mid-Q3 (hard deadline, Ubuntu Trusty EOL) task T210478   Done
  • STRETCH GOAL: Investigate if it is feasible to deprecate the research user account in favor of a multi-account solution

Status edit

  Note: February 14, 2019

  • Dbstore migration is on track, should be finished by mid March. Users already have access to new 3 machine clusters.

  Note: March 14, 2019

  • Cluster db has been migrated with work by Analytics and DBA, we have decided to  N Postpone any changes with research user account in the light of us wanting to move from MySQL as the main data store for data access.
  • Dbstore migration is now   Done


Outcome 1 / Output 1.1 (SRE) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Primary team(s): SRE, Dependencies on: Cloud Services, Analytics

Goal(s) edit

Base system/distribution update edit

  • Remove remaining Ubuntu deployments from the production cluster
  • Adjust our operating system base layer to work on the forthcoming Debian 10/buster release
  • Install or upgrade 5 systems to buster
  • Draft a policy for operating systems lifecycle and subsequent EOL dates

Status edit

  Note: January 10, 2019

  • Discussed that as we've just gotten back from our vacations, this work is ramping up and is   In progress

  Note: February 13, 2019

  • Bare-metal buster installations now working, the first production system with Buster (stat1005) is being installed. On track.   In progress

  Note: March 27, 2019

  • Remove remaining Ubuntu deployments from the production cluster is   Partially done and will wrap up by April 25, 2019. The rest of this goal is   Done.


Outcome 3 / Output 3.1 (WMCS) edit

Users can leverage a reliable and public Infrastructure as a Service (IaaS) product ecosystem for VPS hosting.

Maintain existing OpenStack infrastructure and services

Primary team: WMCS

Goal(s) edit

  • Replace Trusty with Debian Jessie/Stretch in Cloud Services infrastructure layer   In progress
  • Remove all Ubuntu-based instances from all Cloud VPS projects   In progress
  • Evaluate Ceph as a storage service component by building a proof of concept virtualized cluster   To do

Status edit

  Note: January 9, 2019

  • Discussed that as we've just gotten back from our vacations, this work is ramping up and is   In progress

  Note: February 13, 2019

  • Discussed that the replacing of Trusty is still   In progress and probably go into April.
  • Removing all Ubuntu-based instances is   Partially done and notifications went out last week for the new grid information; we hope to be totally done by end of quarter, one way or another.
  • Evaluating Ceph is still   To do as we work on other more pressing goals.

  Note: March 13, 2019

  • The timeline for replacing Trusty slipped a bit, but is   Partially done, is expected to be finished in Q4
  • Removing Ubuntu instances is   Partially done but will also be extended into Q4
  • Eval of Ceph has been  N Postponed to Q4.


Outcome 3 / Output 3.2 (WMCS) edit

Users can leverage a reliable and public Infrastructure as a Service (IaaS) product ecosystem for VPS hosting.

Replace the current network topology layer with OpenStack Neutron

Primary team: WMCS

Goal(s) edit

  • Migrate 100% of Cloud VPS projects to the eqiad1 region and its Neutron SDN layer   In progress
  • Rebuild "labtest" staging environment as "cloud-dev" staging environment   In progress
  • (stretch goal) Upgrade OpenStack deployment to Newton or newer version on Debian Stretch hosts   In progress

Status edit

  Note: January 9, 2019

  • Discussed that as we've just gotten back from our vacations, this work is ramping up and is   In progress

  Note: February 13, 2019

  • Migration is still   In progress but  N Stalled on ToolForge issues - will be completed in April 2019
  • Rebuild is   In progress, racking and unracking hardware is fully underway.
  • Our stretch goal is now   In progress, as the spike to figure out what we need to do is   Done. Implementation is   Blocked on the migration to Debian.

  Note: March 13, 2019

  • We are currently  N Blocked on the Trusty issue
  • We are hoping to complete the staging environment,   Partially done
  • Stretch goal will be pushed to Q4


Outcome 4 / Output 4.1 (WMCS) edit

Members of the Wikimedia movement are able to develop and deploy technical solutions with a reasonable investment of time and resources on the Wikimedia Cloud Services Platform as a Service (PaaS) product.

Maintain existing Grid Engine and Kubernetes web services infrastructure and ecosystems.

Primary team: WMCS

Goal(s) edit

  • Build Debian Stretch grid engine in Toolforge and assist community in migration   Done
  • Upgrade Toolforge Kubernetes cluster to a well supported version and plan future upgrade cycles   In progress

Status edit

  Note: January 9, 2019

  • Discussed that as we've just gotten back from our vacations, this work is ramping up and is   In progress

  Note: February 13, 2019

  • Debian stretch grid has been built out   Done and we're migrating and helping the community with any fixes as needed, and   In progress
  • Upgrading k8s cluster is also   In progress, with lots of work to do be done after the active planning phase is completed.

  Note: March 13, 2019

  • Stretch grid is   In progress with a revised schedule of tasks, hoping to wrap up by week of March 25th (508 tools still remaining, nearly 50% moved)
  • Upgrading the k8 cluster is   In progress and in planning stage currently


edit

Outcome 1 / Output 1.1 (SRE) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Primary teams: SRE / Infrastructure Foundations Dependencies on:

Goal(s) edit

First steps towards Puppet 5 edit

  • Upgrade Puppet agents to v5.5 across all production jessie & stretch systems
  • Upgrade Facter to v3.11 across all production jessie, stretch and buster systems
  • [stretch] Explore further steps towards the Puppetmaster, Hiera and PuppetDB upgrades

Status edit

  Note: May 8, 2019

  • Both goals are   Partially done, stretch goal is also   Partially done

  Note: June 7, 2019

  • Goal is   Done, stretch goal is also   Partially done


Outcome 1 / Output 1.1 (SRE) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Primary teams: SRE / Service Operations Dependencies on: WMCS, Community Relations

Goal(s) edit

Discourse edit

Status edit

  Note: May 8, 2019

  • Prep work is ongoing and in early stages   In progress

  Note: June 13, 2019

  • This is  N Postponed for now, we'll revisit next FY


Outcome 1 / Output 1.1 (SRE) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Primary teams: SRE / Service Operations Dependencies on: WMCS, Community Relations

Goal(s) edit

Address Database infrastructure blockers on datacenter switchover & multi-dc deployment

  • Purchase, setup (accelerated) codfw core DB hosts
  • Provision and setup the new 13 eqiad DBs
  • Failover some old eqiad DB masters to new hardware

Status edit

  Note: May 8, 2019

  • This is currently  N Blocked on the data center ops after purchasing the servers, but overall it is   In progress and ongoing.

  Note: June 13, 2019

  • Purchase and setup is   Done, provisioning is   In progress; failover is   In progress and on track to finish this quarter. We'd like to failover some of the equid masters and see where it takes us.


Outcome 1 / Output 1.1 (SRE / Traffic) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Primary teams: SRE / Traffic

Goal(s) edit

Deploy TLS 1.3 for main cache clusters

Implement secure redirect service for non-canonical domains

Convert cache_upload to ATS backends in ulsfo

  • https://phabricator.wikimedia.org/T219967
  • Puppetize the combination of varnish-frontend + ATS-backend on a single cache node
  • Convert all of cache_upload @ ulsfo to the new combined configuration
  • Stretch: convert more/all datacenters

Deploy Bird-lg public looking glass service

Deploy Anycast Recursive DNS

  • https://phabricator.wikimedia.org/T186550
  • Finish any remaining design / implementation review
  • Test failure scenarios, test service from every DC
  • Enable via resolv.conf for some minimal set of production clients

Status edit

  Note: May 8, 2019

  • We will most likely be doing this in ATS and it is   In progress with test/deploy to be done later.
  • Secure redirect has not been started yet
  • Convert cache_upload is   Done and all hosts are running ATS currently
  • Conversations are   In progress to see if we want to deploy Bird-lg public looking glass service, might be declined later on.
  • Deploy Anycast Recursive DNS is   In progress

  Note: June 13, 2019

  • Deploy TLS 1.3 for main cache clusters might be able to be finished this quarter and is   Partially done.
  • Implement secure redirect service for non-canonical domains is currently  N Stalled due to more urgent work
  • Deploy Bird-lg public looking glass service is  N Not done and will move to next FY
  • Deploy Anycast Recursive DNS is   In progress and should be finished up by the end of the quarter.


Outcome 1 / Output 1.5 (SRE) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

We have scalable, reliable and secure systems for data transport and storage.

Primary teams: SRE / Infrastructure Foundations Dependencies on: Analytics Engineering

Goal(s) edit

Transition Kafka main ownership from Analytics Engineering to SRE edit

  • Review current architecture/capacity and establish plan for Kafka main cluster upgrade/refresh to cover needs for next 2-3 years
  • Audit existing Kafka main producers/consumers and document their configuration and use cases
  • Establish guideline documentation for Kafka cluster use cases (main, jumbo, logging, etc.) (note: added to clarify scope of Kafka main cluster going forward)
  • Upgrade and expand Kafka main cluster

Status edit

  Note: May 8,2019

  • This is   In progress and we are working on hardware procurement.

  Note: June 13, 2019

  • Design and planning is   Done, existing producers   In progress, documentation is   Done and the setup to upgrade and expand is   In progress.


Outcome / Output (Analytics) edit

We have scalable, reliable and secure systems for data transport and data processing.

Dependancies on: SRE

Goal(s) edit

  • Remove computational bottlenecks in stats machines via modenizing our hardware: addition of a GPU that can be used to train ML models T148843

Status edit

  To do May 2019

GPU is working and tensorflow ML tests are running. We have however, one close source library that contains image processing with openCL that we need to see if we can stub and use.   In progress

  To do June 2019

Discussed...


Outcome / Output (Analytics) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Goal(s) edit

  • Upgrade the cloudera distribution of analytics cluster to CDH5.16 T218343

Note this work is contingent in team evaluating wether new version provides enough value in terms of security upgrades.

Status edit

  To do May 2019

  Done

Outcome 1 / Output 1.1 (Performance) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Deploy, update, configure, and maintain and improve production services, platforms, tooling, and infrastructure (Traffic infrastructure, databases & storage, MediaWiki application servers, (micro)services, network, Infrastructure Foundations, Analytics infrastructure, developer & release tooling, and miscellaneous sites & services)

Dependencies on: SRE, Core Platform, Multimedia

Goal(s) edit

  • Explore/implement {{PREVIEWMODE}} concept and curtail use of {{REVISIONID}}
  • Evaluate alternatives for image-embedding in ResourceLoader stylesheets.
  • Investigate how to make DB replication lag checks account for secondary datacenters.
  • Get AbuseFilterCachingParser re-enabled
  • Help TimedMediaHandler migration from Kaltura to Video.js
  • Mobile device testing (add documentation for setting up phones and server)
  • Use Docker for WebPageTest.
  • New performance APIs origin trials (Event Timing, Priority Hints, Feature Policy reporting, Element Timing for Images, Layout Stability)
  • Reduce reliance on master-DB writes for file-dependency tracking.
  • Swift cleanup + WebP ramp up.
  • Write two performance topic blog posts.
  • [Ongoing] Support and maintenance of MediaWiki's ResourceLoader and associated components
  • [Ongoing] Support and maintenance of MediaWiki's object caching and data access components
  • [Ongoing] Support and maintenance of Thumbor/thumbnail infrastructure
  • [Ongoing] Support and maintenance of WebPageTest and synthetic testing infrastructure

Status edit

  Note: May 8, 2019

  • Evaluate alternatives for image-embedding in ResourceLoader stylesheets is   To do
  • AbuseFilterCachingParser re-enabled is also   To do as well as TimedMediaHandler migration from Kaltura is   To do
  • Swift cleanup + WebP ramp up has not started yet as well   To do
  • everything else on this list is currently being worked on and is   In progress

  Note: June 27, 2019

  • Work on the AbuseFilterCachingParser is   Done for this goal/team.
  • TimedMediaHandler migration is also   Done
  • Swift cleanup + WebP ramp up is   In progress and will continue next FY
  • Mobile device testing and documentation is   Done
  • Docker for WebPageTest testing is   Done
  • API origin trials are also   Done
  • Reduce reliance on master-DB writes for file-dependency tracking is still   In progress and will go into early next quarter.
  • Swift cleanup and WebP ramp is   In progress and will continue into next quarter
  • We wrote 5 performance topic blog posts, yay!   Done


Outcome 1 / Output 1.1 (RelEng) edit

Current levels of service are maintained and/or improved for all production sites, services and underlying infrastructure.

Goal(s) edit

  • Undeploy the CodeReview extension.

Status edit

  Note: April 8, 2019

  • This is   In progress

  Note: May 7, 2019

James and Core Platform need to chat about this, so  N Blocked for now

  Note: June 4, 2019

This is still  N Blocked for now and probably won't be able to be completed this quarter. We want to clean up the code, but this is not an urgent goal.


Outcome 2 / Output 2.1 (Performance) edit

Better designed systems

Assist in the architectural design of new services and making them operate at scale

Primary team: Performance

Goal(s) edit

  • Supporting MW sessions in Cassandra for Beta Cluster.

Status edit

  Note: May 8, 2019

  • This is now   In progress

  Note: June 27, 2019

  • This is   In progress and is expected to finish up by end of next quarter.


Outcome 3 / Output 3.1 (WMCS) edit

Users can leverage a reliable and public Infrastructure as a Service (IaaS) product ecosystem for VPS hosting.

Maintain existing OpenStack infrastructure and services

Primary team: WMCS

Goal(s) edit

  • Complete partial goals from past quarters   Done
    • Replace Trusty with Debian Jessie/Stretch in Cloud Services infrastructure layer
    • Remove all Ubuntu-based instances from all Cloud VPS projects
  • Evaluate Ceph as a storage service component by building a proof of concept virtualized cluster

Status edit

  Note: June 6, 2019

  • This is now   Done: Replace Trusty with Debian Jessie/Stretch in Cloud Services
  • Ceph design and evaluation is fully   In progress, this work will continue into Q1 as a major goal.

  Note: June 27, 2019

  • Evaluating Ceph is still   In progress and getting hardware to build up the cluster (discussing things like where and how to rack servers, etc) and this work will continue into next FY as the largest ongoing goal for the year.


Outcome 3 / Output 3.2 (WMCS) edit

Users can leverage a reliable and public Infrastructure as a Service (IaaS) product ecosystem for VPS hosting.

Replace the current network topology layer with OpenStack Neutron

Primary team: WMCS

Goal(s) edit

  • Complete partial goals from past quarters
    • Migrate 100% of Cloud VPS projects to the eqiad1 region and its Neutron SDN layer   Done
    • Rebuild "labtest" staging environment as "cloud-dev" staging environment   Done
    • Upgrade OpenStack deployment to Newton or newer version on Debian Stretch hosts   In progress

Status edit

  Note: June 6, 2019

  • Migrating and rebuilding the new environment are both   Done and the upgrade of OpenStack deployment is   In progress and probably will run into Q1.

  Note: June 27, 2019

  • Neutron is   Done - yay! OpenStack update is still   In progress as a stretch goal and will continue into next FY with help from DCOps to get up on bigger network links and switches.


Outcome 4 / Output 4.1 (WMCS) edit

Members of the Wikimedia movement are able to develop and deploy technical solutions with a reasonable investment of time and resources on the Wikimedia Cloud Services Platform as a Service (PaaS) product.

Maintain existing Grid Engine and Kubernetes web services infrastructure and ecosystems.

Primary team: WMCS

Goal(s) edit

  • Complete partial goals from past quarters
    • Upgrade Toolforge Kubernetes cluster to a well supported version and plan future upgrade cycles

Status edit

  Note: June 6, 2019

  • The upgrade to toolforge is  N Postponed due to unforeseen staffing issues but we hope to have it done early next FY.

  Note: June 27, 2019

  • The upgrade to toolforge is now   In progress, but will continue through next FY.


Outcome 6 / Output 6.1 (Core Platform) edit

Improved MediaWiki availability and reduced read-only impact from data center fail-overs

Production deployment of routing of MediaWiki GET/HEAD requests to the secondary data center.

Dependancies on: SRE

Goal(s) edit

  • Prepare MW and the secondary DC for enabling the ability to serve requests from both DCs
  • Finish comment storage changes
  • Finish actor storage changes

Status edit

  Note: May 8, 2019

  • This is   In progress

  Note: June 27, 2019

  • This is   In progress and we'll have a complete definition of done on July 1 (will wrap up by July 15)