Topic on Talk:Team Practices Group/Best Practices Handbook/Archive 2

Should projects with Epics have a separate Epic column?

2
JAufrecht (WMF) (talkcontribs)

Kevin: I'm not convinced that an EPIC column is necessary (or helpful). Maybe it should be offered an option rather than a dictate? Or perhaps you can persuade me that it is the One Right Way(tm) to do it.

KSmith (WMF) (talkcontribs)

As a data point, the Discovery PO added an Epic column to the Discovery product backlog workboard, so I'll get to see the pros and cons first-hand.

Reply to "Should projects with Epics have a separate Epic column?"